HOMENews

Kitchen renovation needs attention matters

Kitchen renovation needs attention matters

2023-07-06 11:07:46

Nowadays, with the continuous development of society, we will also think of renovating the kitchen. So what are the precautions for kitchen renovation? Here is a look at it with Xiaobian.

First, unsuitable pipes need to be reformed

The interior of the old kitchen is a little more complicated. In addition to asking the cabinet manufacturer to measure the kitchen, but also to see whether the original position of the various pipes are suitable, if not suitable and need to be changed, a drawing will be given to the decoration company, and the construction team will carry out the necessary transformation according to the drawing.

Second, the transformation of gas and natural gas pipelines in the old kitchen needs to be careful

These two kinds of pipes are generally not allowed to be altered at will. If it has to be changed, it must be approved by the property company. When changing, due to the strong professionalism, and to facilitate future maintenance, usually by the gas, natural gas company or property company designated by the professional company responsible for the change.

Third, add a hot water pipe

The old house is generally a single water supply, so when the kitchen is decorated, it is best to add a hot water pipe. In addition, the general family bathroom is relatively small, can only put the washing machine in the kitchen, which must be connected to a water pipe, while increasing the ground drain pipe. It should be reminded that due to structural limitations, water changes can only be changed to the upper water, not to the water.

Fourth, the installation of gas meters

The old kitchen renovation, to move the gas meter from the original position to the other wall, and the wall has been installed cabinets, there is no room to install the gas meter. At this time, only a hole can be made in the cabinet floor, and the gas meter can be hidden in the cabinet, but in this way, the problem is difficult to find in time, and it is easy to leave a security risk.

Five, do a closed water test

Before making water supply and drainage renovation, it is recommended that the space be tested for closed water first, and then accepted by the relevant property. If you find that there is water leakage, you can find the property to solve. Lest there be leakage after the transformation, the responsibility is not clear.

Six, the kitchen and bathroom position planning

Before construction, it is necessary to plan the length of the pipeline better than the wall, and the size of the pipeline at the end of the wall should take into account the final size of the wall tile, especially the pipeline directly connected to the faucet and other sanitary ware after the wall. In addition, the direction of the pipeline should avoid the wire pipe into the wall as far as possible, so as to avoid the future water pipe rupture and leakage affecting the electricity.

The above is the introduction of kitchen renovation precautions after work, I hope it can help you.