HOMENews

How to install PVC bathroom cabinet installation and maintenance knowledge

How to install PVC bathroom cabinet installation and maintenance knowledge

2022-12-21 01:12:31

The bathroom is usually the most humid place. PVC bathroom cabinets are made of polyvinyl chloride and other materials, and high-density double-skinned PVC sheets are used, which have strong waterproof performance and high hardness. Branded hinges and painted rails are used. Scratch-resistant, high-density, durable . Various styles and novel designs. Aiming at the problem of dampness in the bathroom, the stainless steel or PVC bathroom cabinets that have undergone strict moisture-proof treatment are selected to ensure a certain degree of waterproof performance. Let me teach you how to install PVC bathroom cabinets today.

1. Main cabinet installation method:

1. Wall-mounted bathroom main cabinet: Select the wall to be installed according to the hole position on the back wall of the cabinet, but the height of the counter surface from the ground is between 80-82CM. Use an impact drill to punch holes in the wall. The accessory plastic in the cabinet is expanded and loaded into the hole, and then the main cabinet and the wall are locked with self-tapping screws. After the main cabinet is installed, align the basin with the wooden bar of the cabinet and adjust it to be flat.

2. Floor-standing bathroom main cabinet: Take the cabinet body and components out of the packing box, screw the cabinet legs and components on the fixing piece through double-ended screws, and then lay the cabinet flat and place it in an appropriate position.

Second, pay cabinet (shelf) installation:

The installation method is the same as that of the wall-mounted bathroom master cabinet.

Third, bathroom mirror installation:

Firstly, according to the positions of the two holes on the back of the mirror, determine the positions of the two holes on the wall above the main cabinet with a suitable bitmap, but the size of the bottom end of the mirror and the top of the main cabinet is between 23-28CM, and then punch holes and screw on the self- screw, so that the mirror can be installed.

Four, bathroom cabinet installation other matters:

1. The design and installation of the sewer pipe: Before installing the PVC bathroom cabinet, you must consider whether it is wall drainage or floor drainage. If it is wall drainage, the reserved hole on the wall of the sewer pipe should be between 50-55CM from the ground. And for the middle of the cabinet, as long as the ground drainage hole is reserved in the middle of the cabinet, but not too far from the wall.

2. Water inlet pipe: As long as the outlet of the hot and cold water inlet pipe is in the middle of the cabinet, it should be between 45-50CM or slightly higher than the ground.

3. Mirror front light: If you need to install a mirror front light, the outlet of the wire should be about 200CM from the ground, and placed in the middle of the PVC bathroom cabinet.

5. Matters needing attention and maintenance:

1. Keep the air circulation in the bathroom

2. Please avoid placing cabinets and mirrors directly on the ground during installation. Soft objects such as cardboard should be placed on them. 3. During installation, pay attention to prevent metal objects such as screwdrivers from scratching the protective layer on the surface of the cabinet. 4. When cleaning the cabinet , It is best to use neutral reagents for cleaning agents, such as: use toothpaste to decontaminate, wipe with a soft cloth is a simple maintenance method, and you can also spray some furniture-specific liquid wax on the cabinet, which is convenient to wipe and bright, and it also has a certain effect. Waterproof protection 5. Try to keep the dry and wet separation of the space to prevent water from remaining on the cabinet for a long time and lose its due smoothness and beauty.